Pre-engineered building: Logistics Hub Mezzanine completed by Deepika Builtech
Back to Portfolio
Mezzanine FloorCompleted

Logistics Hub Mezzanine.

Location

Sriperumbudur, TN

Area

30,000 Sq.Ft

Client

Express Cargo Hub

Timeline

Completed 2021

Project Overview

Expanded operational floor space within the existing building footprint. This structural mezzanine was engineered to support heavy sorting equipment and office spaces.

Heavy Load Capacity (500kg/sqm)

Bolt-on Foundation Design

Integrated Safety Railings

Anti-skid Decking

Technical Data

Category

Mezzanine Floor

Build Method

Pre-Engineered Structural Steel

Safety Standard

IS 800:2007 (Steel Design Code)

Request Similar Project
Start a Similar Project

Ready to Build Your
Mezzanine Floor Facility?

Talk directly with our engineering team. Get a site-specific quote within 24 hours.